Stock Price : SR
 KSA - Nov 26, 2014
Search:
     Auctions
     Special Offers

 

Charter of Services

* Project Summary

 Clients Reference

 Contact Us

 

PROJECTS SUMMARY

Click for the Detailed Project Reference List

 

HUB-JAMSHORO (Pakistan)

Hub-Jamshoro is the US$100 Million overhead transmission line project in Pakistan designed to delivery electricity 180km from a new power station on the Hub River to the city of Jamshoro.  Working with local people, Total Solutions coordinated contractors, plant, materials and technical support necessary to construct this advanced two line 500kV transmission link.  Line 1 of this ambitious project was completed in a record time of 14 months.  An Islamic financing packaging, provided by SCC Marketing (SCCM), played a key role in making this project.

 

 

380KV SHOIABA OHTL (Saudi Arabia)

A turnkey project comprises of design, manufacture, supply, erection, testing and commissioning of 2-Lines of 380kV Overhead Transmission Line. Line 1, looping of existing South Azizia – SWCC Shoaiba Circuit to EWR Shoiaba Substations with an approximate loop length of 5km.  Line 2, looping of Kilometer 12 (KMT-12) – East Desalting Road Substations to EWR Shoaiba, having an approximate loop length of 110km. This 236.5MSR project is considered as a major step towards increasing the reliability of electric power transmission as planned by Saudi Electric Company meeting the future increasing demands on electric power in the Western Region of the Kingdom.

 

 

BAHRAIN - 220KV POWER DEVELOPMENT 2000-2004 (BAHRAIN)

A 20.6 MUSD contract with Bahrain's Ministry of Electricity & Water for the supply and installation of 150km of 220kV XLPE cables, optical fibre cables and associated accessories.  The contract covers the longest extra high tension voltage awarded in the region that will cater to the increasing power demand in the Kingdom of Bahrain equipped with the advance 'Distributed temperature sensing and monitoring system'.

    

 

OPERATION DESERT LIGHT (Kuwait)

'Operation Desert Light' was a rapid response turnkey project to restore electricity to the paralyzed Kuwaiti nation following the Gulf War in 1991.  Despite widespread destruction and a still active battle field environment, SCC Projects Division, now Total Solutions, successfully mobilized contractors, plant and support logistics and restored power to Kuwait in just 19 days.  Additional projects for transmission line repair and restoration continued with the ultimate refurbishment of over 2,400 line kilometers.

 

380KV JEDDAH NORTH OHTL (Saudi Arabia)

A 380kV 4-Circuit Overhead Transmission Line Project having Quad Bundle AAAC Conductor and Long Rod Porcelain Insulators.  These lines pass through rugged mountainous terrain in the east of Jeddah.

  

 

400KV OVERHEAD LINES 'D' REPOWERING TO 'H' STATION (United Arab Emirates)

Supply, installation and commissioning of a new 55 kms, 400 kV Overhead Line Circuit and Substation Modification for Dubai Electricity & Water Authority.

 

BANIMALIK & RABWAH-NAEEM U/G (Saudi Arabia)

An on-going project to construct Banimalik, Wazeeriah & EEH S/Ss (110/13.8kV Power, Pilot & Fiber Optic Cable Project) and construction of Naeem, Rabwah & KM-8 S/Ss (110/13.8kV Power, Pilot & Fiber Optic Cable Project).  Both projects are being executed for Saudi Electricity Company - Western Operating Area.

   

 Charter of Services

 Project Summary

 Clients Reference

 Contact Us

 

 


My SCC Human Resources Contact Us Site Map
 © Saudi Cable Company 2004 All Rights Reserved   Privacy Policy - Terms & Conditions